Bay/Porter to State Park Dr

Auxiliary Lanes, Bus on Shoulder Lanes, and Mar Vista Bike & Ped Overcrossing Project

  • Northbound and southbound auxiliary lanes between Bay Avenue/Porter Street and Park Avenue interchanges and between Park Avenue and State Park Drive interchanges
  • Bus-on-Shoulder operations
  • Bicycle/pedestrian overcrossing at Mar Vista
  • Replace the existing Capitola Avenue bridge crossing Hwy 1 with a new bridge including improved sidewalks and bike lanes

Project Fact Sheet
Project Exhibit

Project Schedule

Estimated schedule and cost for the project include environmental review, project design, right-of-way, and construction phases, subject to change.

Phase Schedule
Environmental (PA/ED) Completed May 2021
Final Design (PS&E) Completed FY 20/21 – Fall 2022
Right-of-Way Spring 2021-Summer 2022
Advertisement/Award FY 22/23
Construction Spring 2024-2026

Project Purpose and Need

The purpose of the project is to:

  • Improve traffic and safety operations on Highway 1
  • Reduce cut-through traffic diverting to local streets and neighborhoods by
    adding auxiliary lanes between Bay Avenue/Porter Street and State Park Drive
  • Improve bicycle and pedestrian connectivity to regional destinations and
    transit by providing enhanced bicycle and pedestrian facilities for active
    transportation users at Capitola Avenue
  • Add infrastructure for buses to travel in the auxiliary lanes between
    interchanges and on the outside shoulder through interchanges
  • Improve bicycle and pedestrian connectivity to regional destinations and
    transit by providing a dedicated crossing for active transportation users at Mar Vista
  • Connect neighborhoods, schools, parks/beaches and commercial centers
  • Promote the use of alternative transportation modes to increase transportation system capacity and reliability
  • Widen the overcrossing at Capitola Avenue to current standards

This project is needed because:

  • Several bottlenecks along Hwy 1 in the southbound and northbound directions cause congestion during peak hours, significantly delaying drivers. As a result, “cut‐through” traffic—or traffic on local streets—is increasing because drivers are seeking to avoid congestion on the highway.
  • There are limited opportunities for pedestrians and bicyclists to safely navigate SR 1 in the project corridor, even though portions of the project area are designated as regional bicycle routes.
  • There are insufficient incentives to increase transit service in the Hwy 1 corridor because congestion threatens reliability and cost‐effective transit service delivery.
  • The existing length (i.e., span) of the Capitola Avenue overcrossing cannot accommodate a wider freeway. In addition, the existing overcrossing does not meet current standards for vertical clearance over the freeway, has substandard widths, and does not have bicycle lanes across the bridge. The bridge must be reconstructed to meet current standards.

Environmental Analysis

A joint Environmental Impact Report/Environmental Assessment (known as an EIR/EA) was prepared pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA). Caltrans is the lead agency under CEQA and assumed responsibilities of lead agency for the Federal Highway Administration under NEPA assignment.